Tucson Stucco’s scope of work for the El Dorado Hospital Repair was to provide and install scaffolding for the
construction team to install a chase and installing a 3-coat stucco system to match the existing building texture.
The project required ____________ gallons of stucco.
Application/technique details
Duration: 4 weeks
Delivery: 0ctober 2016
General Contractor: W.E. O’Neil Construction Company
Client: TMC Healthcare Group